Porsche Consulting Case Study: 2 Official Cases + 4 More
A Porsche Consulting case study is an operational case, and the firm publishes two to practise: Pumps Inc., a pump maker with unreliable deliveries, and a ten minute payback estimate for Berlin airport. Below, each is explained in our own words, followed by four original operations cases with worked numbers and one trap each.
What are the Porsche Consulting practice cases?
Porsche Consulting publishes two cases for candidates, "Pumps Inc." and Berlin Brandenburg airport, each with approach points and a suggested answer (checked 24 November 2026). They sit on the firm's careers site in English and German, and the firm's application page links to them.
How does the Porsche Consulting case work?
After the specialist interview you work an operational case, and the firm says it wants a structured approach and enthusiasm, not memorised theory. That is what the firm's application page says about the stage it calls the technical interview and case. The stages around it are a phone interview of about 30 minutes, an online test of about 45 minutes for Young Professionals, and a final interview with the potential manager. The page gives no length for the case itself.
Start a free case interview for Porsche Consulting

Don't know how to case yet? Learn how to case
The firm does not publish the exact format. What follows is reported by candidates, from interview reports and forum threads in 2026, and may differ by office and role:
- A candidate on a forum thread (February 2026) described getting the information, being left alone for 10 minutes, then presenting for 5 minutes. Coaches replying described it as a condensed written case.
- A June 2026 report for an intern interview described about one hour: personal fit, a CV walk through, then a normal case.
- Several reports describe a fit heavy process, and one described a sales channel structuring question.
- Coaches name operational efficiency, lean, manufacturing, supply chain and throughput as the usual case types.
None of this is official. The firm confirms a case follows the specialist interview and nothing more, so ask recruiting for the exact format when you are invited. For the stages in order and what each tests, see the Porsche Consulting case interview guide. For the written case and presentation skills this format rewards, see the written case and presentation playbook.
Case 1, Pumps Inc.: why are deliveries unreliable?
The case rewards finding where the queues form and whether product and machine are matched, not a generic list of causes. This is our summary of the firm's published case, in our own words. We have not reproduced its tables, and the product to process matrix is a worksheet we could not read in full, so we give no numbers from it. Open the official page for the data.
The setup. A fictional industrial goods company with about 2.4 billion euro in annual revenue sells five pump types. Sales complains that production makes delivery promises it cannot keep. The board asks you to analyse production and find causes. The technical board member thinks products are not matched to the best production resources. The head of production supplies a product to process matrix for you to work with.
The facts that matter. Production is a job shop: almost every product can run on almost every machine, yet some machines have long queues. Each pump passes through mechanical production, electrical production and surface treatment before assembly. One pump buys in its mechanical and electrical parts and skips those steps. Another can only run on the small mechanical machine. A third cannot run on one of the electrical machines. Sales has confirmed next year's volumes for each product.
What the official answer looks for, in our words. The published approach points to queues caused by unsynchronised flow, parts availability, re-planning, machine failures, sickness and changeovers. It then moves to matching product to machine so overloaded machines (above 100 percent of planned capacity) hand work to idle ones, closing the gap between planned and actual output, and linking sales, production and procurement planning.
What to practise.
- Rank the causes by size before listing them. A job shop has many possible reasons for lateness; the interviewer wants the largest one first.
- Ask for the load table, planned load by machine against available hours, before you propose anything. Overloaded and idle machines side by side is the finding.
- Name the constraints that stop a simple rebalance: the product that can only run on one machine is where the matching idea breaks.
- Close with who has to change what. Delivery promises come from sales, so a production fix alone does not finish the case.
After you read the official answer, redo it with changed numbers: move a product to another machine, add a machine loss, and see what happens to the queue. Case 3 below does exactly that with numbers we built.
Case 2, Berlin airport: how long until the construction cost is repaid?
The firm's own answer is cost divided by passengers times revenue per passenger: about 9.8 years. The case asks how long Berlin Brandenburg airport would need to repay its construction cost from passenger air traffic alone, with ten minutes to document an approach and present a solution. Interest, operating costs, cargo, parking and rental income are set aside.
The figures below are the firm's published inputs, taken from its pre-opening case page, so treat them as a teaching exercise and not as current airport numbers.
The calculation has two lines. Revenue a year is 26 million times 20 euro, about 520 million euro. The payback is 5.1 billion divided by 0.52 billion, which is 9.8 years.
The part candidates skip is where the 20 euro comes from. The official explanation builds it from one sample flight: a 108 passenger plane with its landing charge, a passenger charge, a security charge and a stowage charge. Adding those and dividing by 108 gives about 19.82 euro per passenger, which the page rounds to 20. In an interview you will not have the tariff sheet, so the skill is stating an assumption out loud ("I will assume about 20 euro a passenger, built from a landing charge shared across the passengers plus per passenger fees") and moving on.
What to practise. Say the structure first (revenue per year, then years to repay), then the arithmetic, then one sentence on what the answer ignores: interest, operating cost and other income. Then redo it in ten minutes with your own assumptions: a different passenger number, a lower revenue per passenger, and see how the payback moves. A 20 percent drop in revenue per passenger turns 9.8 years into 12.3. Say the sensitivity out loud, because the recommendation depends on it.
The same shape appears in Case 5 below on a client you have not seen. For the underlying method see break-even analysis in case interviews and consulting math formulas.
How do you work a 10 minute case and a 5 minute presentation?
Read for 2 minutes, structure for 5, plan your opening for 3, then lead with the recommendation. This timing is our practice plan, built on the format candidates report. It is not a Porsche Consulting rule.
A four block page keeps you from reading your notes aloud:
- Question: what the client asked, in your words.
- Evidence: the two or three numbers that carry the answer.
- Action: what to do first, who owns it, what it costs.
- Risk: the one thing that would change the recommendation, and how you would check it.
For giving a recommendation under time pressure, see case interview synthesis.
Case 3 (ours): a gearbox job shop with late deliveries
The trap in this case is that a perfect rebalance still leaves both machines overloaded. This is an original case with a made-up client and made-up numbers. It trains the same skill as Pumps Inc.: load against effective capacity.
The prompt. A gearbox maker has two milling groups, Mill A and Mill B, each available 100 hours a week. Customers complain about late gearboxes. Planned and unplanned stops, such as changeovers and breakdowns, take 13 percent of the available time on each mill. Product P (90 hours of work a week) can only run on Mill A. Product Q (30 hours a week) can run on either. All other work (60 hours a week) already runs on Mill B. What do you recommend?
Step 1: effective capacity. 100 hours less 13 percent is 87 hours on each mill.
Step 2: today's load.
Mill A is the queue. Mill B has spare time. Product Q is the lever, because it can run on either.
Step 3: move Q to Mill B.
The trap. The rebalance is perfect and both mills are still above 100 percent. Total load is 180 hours against 174 hours of effective capacity, so no assignment can fix it. A candidate who stops at "move Q" has solved the matching problem and left the queue.
Recommendation. Move Q to Mill B now, then attack the losses. Cutting losses from 13 percent to 10 percent gives 90 effective hours on each mill, which only reaches 100 percent and leaves no room for a breakdown. Cutting them to about 6 percent gives roughly 94 hours each and a load near 96 percent. Order matters: rebalance first because it costs nothing, then fix changeovers and breakdowns before buying a machine. Control it with a weekly load table by machine, load against effective capacity, so the next overload shows up before it becomes a late order.
What the interviewer tests. Whether you check the total, not only the split. Ask: "Is there enough capacity overall?" before you propose a rebalance.
For a capacity gap with exhibits, run this library case out loud.
Close a capacity gap in a distribution center
Retail Supply ChainMedium
Case 4 (ours): how big should the batch be on a four variant line?
Daily batches have the shortest lead time but leave no room for a breakdown, so recommend the two day cycle. Original case, made-up client.
The prompt. An assembly line builds 50 units an hour for 16 hours a day. It makes four variants, each with demand of 150 units a day, so 600 units a day in total. Changing from one variant to another takes one hour with no output. The plant manager wants shorter lead times. How big should each batch be?
Step 1: capacity and load. The line can make 50 times 16, which is 800 units a day. Demand is 600, so it needs 600 divided by 50, which is 12 hours of running time a day. That leaves 4 hours a day for changeovers.
Step 2: compare three batch rules.
Average stock held between cycles, a rough measure of how much cash sits in finished goods, is half a batch per variant: 4 times 375 which is 1,500 units for weekly, 4 times 150 which is 600 units for two day, and 4 times 75 which is 300 units for daily.
The trap. Daily batches win on lead time and stock but run the line at 100 percent with zero slack. One breakdown or one late changeover and the day's batch for the last variant is not made. The weekly rule looks safe but a variant can wait most of a week and you hold five times the stock of daily batches.
Recommendation. Run a two day cycle: a variant is built every two days, the line is loaded to 87.5 percent, and the 4 spare hours absorb a stop. Then reduce changeover time, because every 15 minutes saved on four changeovers is an hour back, which is what makes daily batches safe later. State the risk: if demand for one variant jumps, the two day cycle needs a re-check.
Case 5 (ours): a ten minute payback estimate
The trap is paying back on full capacity from day one. Original case with made-up numbers, built to mirror the airport method on a client you have not seen.
The prompt. A carmaker plans a new battery pack assembly hall costing 150 million euro. The hall can build 100,000 packs a year at nameplate capacity. Each pack brings 600 euro of contribution after all the hall's own costs. How many years until it pays back? Ignore interest and tax, and assume the contribution per pack is the same at any volume.
Step 1: the naive answer. 100,000 packs times 600 euro is 60 million euro a year. 150 divided by 60 is 2.5 years. This is the number a rushed candidate gives.
Step 2: add what a plant never does. The interviewer adds two facts: the hall will run at 85 percent OEE (the share of nameplate capacity it actually delivers at steady state), and output in year 1 is 40 percent of that, and in year 2 80 percent.
Step 3: find the crossing. After year 3 the hall has repaid 112.2 million, so 37.8 million is left. At 51 million a year that takes 37.8 divided by 51, which is 0.74 of year 4. The payback is about 3.7 years.
The trap. The first answer, 2.5 years, is a third too short. Applying OEE alone gives 150 divided by 51, which is about 2.9 years, still short because it skips the ramp. Say each assumption out loud and order them: nameplate, then OEE, then ramp.
Recommendation. Present 3.7 years as the base case and name what moves it: a slower ramp, a lower OEE, or a lower contribution per pack. State that the figure ignores interest and discounting, which would lengthen it. The airport case taught the same shape: capital divided by yearly contribution. What this case adds is that yearly contribution is not constant in the first years.
Case 6 (ours): can the new variant reach takt?
The trap is quoting the average cycle time of the line when the slowest station sets the output. Original case, made-up client.
The prompt. A plant adds a new vehicle variant to an existing line. Two shifts give 900 net minutes a day. Demand for the variant is 450 units a day. The line has six stations with these cycle times in minutes: 1.6, 1.7, 1.9, 1.8, 2.4 and 1.4. Can the line deliver, and if not, what do you do?
Step 1: takt time. Available time divided by demand is 900 divided by 450, which is a takt of 2.0 minutes. A station must finish a unit every 2.0 minutes to keep pace.
Step 2: the average is misleading. The six times add to 10.8 minutes, an average of 1.8 minutes, which is below takt. A candidate who stops there says yes.
Step 3: the slowest station. Station 5 takes 2.4 minutes. It can complete 900 divided by 2.4, which is 375 units a day, 75 short of demand, a gap of about 17 percent.
Step 4: compare the options.
Recommendation. Rebalance first: it costs training and tooling, not a new station, and takes the bottleneck from 2.4 to 1.9 minutes. Use overtime only as a bridge while that is done. Keep the parallel station as the fallback if the work cannot be split. State the risk: with a slowest station of 1.9 against a takt of 2.0, any stop eats the 5 percent headroom, so check the station reliability next.
Which library cases should you run aloud?
Run two or three of these out loud after the worked cases, because reading a solution is not the same as saying one under a clock. These are prompts and practice links only. The library has no case in Porsche Consulting's own style, so these are matched by case type to the operational work the firm describes. None is Porsche Consulting material.
| Case (style, industry) | Quant difficulty | Qualitative difficulty | The math you run | Median time |
|---|---|---|---|---|
MetroFresh Distribution Center Operations Turnaround (McKinsey, grocery distribution). 8 (4 with math), 4 exhibits. | easy | hard | Picking capacity gap, EBITDA initiatives | 23 min, 17 voice runs |
AuroraWater Bottling Margin Recovery (McKinsey, packaged beverages). 8 (4 with math), 4 exhibits. | medium | medium | Unit-cost savings, EBITDA bridge | 22 min, 19 voice runs |
TravelLine Call Center Optimization (BCG, travel customer service). 8 (3 with math), 2 exhibits. | hard | medium | Call volume, agents needed, capacity gain | Fewer than 10 runs |
What each one gives you for this firm:
- MetroFresh: a service level and capacity gap in a warehouse, a supply chain case with exhibits.
- AuroraWater: a bottling plant whose margin has fallen, so cost drivers in a plant.
- TravelLine: hard difficulty, a queue and capacity problem outside a factory, the same logic as Pumps Inc.
Two more are adapted from university casebooks and sit lower in the order: Bumpers R Us, an automotive supplier's delivery lead time (adapted from the Duke Fuqua casebook), and Packaging Plant Consolidation, a plant footprint decision (adapted from the Wharton casebook). They are in the case library with the other cases, 92 in all. Every debrief scores seven categories: structure (25% of the score), quantitative analysis (20%), business judgment (15%), and problem understanding, exhibit reading, communication and synthesis (10% each), with feedback on every question. Median times come from completed runs between June 25 and September 22, 2026, and count runs, not people.
The library does not cover everything the firm touches. It has no case on production industrialisation or product launch specifically, so for those lean on the operations framework in operations cost framework and the worked cases above.
How many cases are enough?
Our suggestion, not a firm requirement: both official cases, two of ours, three library cases aloud, then one timed 10 plus 5 round. About seven or eight cases is enough to see the patterns, because operations cases repeat the same few moves: load against capacity, find the bottleneck, rebalance, then check the total.
- Work both official cases with the answer covered, then compare.
- Work two of the four original cases above, one with a trap you fell into.
- Run three library cases out loud and read the debrief for the weakest category.
- Do one timed round with 10 minutes alone and a 5 minute presentation, the format candidates report.
For more depth on the case types, read the guides on operations case interviews, supply chain cases and cost reduction cases, and see a full worked example in the operations case study example. For other firms' operations practice, see the Kearney practice cases and the OC&C practice cases. If you are comparing employers in the sector, see top automotive consulting firms and consulting firms in Germany. For more worked examples across firms, see case interview examples.
Sources and further reading (checked 24 November 2026)
- Porsche Consulting: Case studies (English): the two official cases, Pumps Inc. and Berlin airport, with approach points; the airport figures and the ten minute working time
- Porsche Consulting: Fallstudien (German): the same two cases in German; no working time stated for the pumps case
- Porsche Consulting: Deine Bewerbung: application stages, the case after the specialist interview, no memorised theory, the HR Director tip to solve a published case
- Porsche Consulting: Students: internship length of three to six months, client projects and corporate functions
- Candidate reports (not official): a forum thread on the Porsche Consulting case (PrepLounge, February to March 2026), interview reports on Glassdoor (updated September 2026) and kununu (November 2026)
Frequently asked questions
Let your favorite AI make the case
Ask ChatGPT, Claude, or Perplexity whether Road to Offer is worth it. We're confident you'll like the answer.
No affiliation with ChatGPT, Claude, or Perplexity
Resources and related guides
- Practice for Porsche Consulting in a real case interviewPractice
- Browse all free resourcesResource hub
- Porsche Consulting Case Interview Guide: Process, Operations Cases, and Prep (2026)Firm Specific · Aug 13, 2026
- Kearney Case Study Examples: Official Casebook Cases, Solved (2026)Firm Specific · Nov 5, 2026
- Accenture Case Interview Examples & Practice Cases (2026)Firm Specific · Jul 31, 2026
- Horváth Case Interview Guide: Process, Case Study, and Prep (2026)Firm Specific · Aug 13, 2026